Commit graph

18 commits

Author SHA1 Message Date
213b38a393
build: correct paths
All checks were successful
continuous-integration/laminar-elessar Build 81 succeeded in 50 seconds .
2019-03-12 21:27:05 +00:00
bbd5be43c5
Remove rogue semicolons
All checks were successful
continuous-integration/laminar-elessar Build 80 succeeded in 54 seconds .
2019-03-12 21:24:55 +00:00
ab6b0d0caa
build: Document ci task better
All checks were successful
continuous-integration/laminar-elessar Build 79 succeeded in 48 seconds .
2019-03-12 21:08:08 +00:00
23cfa8dfe9
Automatically deploy slide deck to starbeamrainbowlabs.com
Some checks are pending
continuous-integration/laminar-elessar Build failed with exit code 55 after 54 seconds
2019-03-12 21:01:16 +00:00
1d8062008f
Add where slide
All checks were successful
continuous-integration/laminar-elessar Build 8 succeeded in 45 seconds .
2019-03-11 20:31:58 +00:00
9e0415c6bb
Add useful links
All checks were successful
continuous-integration/laminar-elessar Build 73 succeeded in 47 seconds .
2019-03-11 20:21:01 +00:00
36729b90e3
Add slide on why
All checks were successful
continuous-integration/laminar-elessar Build 72 succeeded in 43 seconds .
2019-03-11 20:20:12 +00:00
380a8d0aae
Create initial theme
All checks were successful
continuous-integration/laminar-elessar Build 71 succeeded in 42 seconds .
2019-03-11 19:31:11 +00:00
fd7a215c96
Do the setup in dev mode
All checks were successful
continuous-integration/laminar-elessar Build 70 succeeded in 45 seconds .
2019-03-11 16:57:06 +00:00
2a3b126e2a
Do CI in production mode
Some checks are pending
continuous-integration/laminar-elessar Build failed with exit code 55 after 18 seconds
2019-03-11 16:55:29 +00:00
e16abe3e6d
Fix setup task
All checks were successful
continuous-integration/laminar-elessar Build 2 succeeded in 44 seconds .
2019-03-11 16:52:26 +00:00
234ed7e9ed
Add CI task
Some checks are pending
continuous-integration/laminar-elessar Build failed with exit code 55 after 8 seconds
2019-03-11 16:50:10 +00:00
23325d02fc
Finish setting up the pipeline. 2019-03-09 16:46:03 +00:00
353d3f43db
Start setting everything up 2019-03-09 16:07:44 +00:00
76ba0ed404
Fill out notes a bit 2019-03-05 20:15:41 +00:00
f4c7ac0a0d
Merge branch 'master' of git.starbeamrainbowlabs.com:sbrl/Linux-101 2019-03-05 20:10:00 +00:00
c658b18ec8 Initial commit 2019-03-05 20:09:28 +00:00
9caed6fb48
Add notes.
I wonder where this'll go?
2019-03-05 20:06:17 +00:00