Commit graph

21 commits

Author SHA1 Message Date
3a859cfc6f
delete old nomad job files
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
2022-05-15 01:24:37 +01:00
3025fda8e4
remove test job 2022-05-01 02:27:21 +01:00
30700caf1c
jobs/dns: move old job file around
we don't need it right now, but we should keep it around as it's not 
certain that we'll never need it again
2022-05-01 02:27:14 +01:00
f8a3ba9eb1
Delete old job files 2022-04-30 15:10:16 +01:00
aa309ec60e
nfs: elete old job 2022-04-28 03:19:25 +01:00
0ef990bff9
delete old wesher + wireguard job files.
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 5 seconds
we *may* need backprots in bullseye for wireguard, but I'm really hoping 
we don't.
2022-03-21 03:19:48 +00:00
3080a4a04e
wesher: rotate
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 5 seconds
2022-03-21 03:16:09 +00:00
741d6c2c03
Finalise initial collectd implementation
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
...it's still all untested.
2021-12-26 15:33:35 +00:00
5f412703e5
fix shellcheck errors
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
2021-12-26 14:59:12 +00:00
3deacee46a
shellcheck again
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
2021-11-26 22:31:14 +00:00
aedfb1cdc5
docker: done in new system
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
2021-11-26 22:30:35 +00:00
6b32736149
config-git: done in new system
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
2021-11-26 22:30:19 +00:00
f112c82140
sbrl-apt-repo: migrate to new system
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
2021-11-26 22:29:34 +00:00
7c84b379f6
laminar-sshkey: done in new system
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
2021-11-26 22:26:34 +00:00
3db65fc833
Done preconfigure in new system 2021-11-26 22:25:33 +00:00
b166334860
ssh-preconnect: done in new system
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
2021-11-26 22:25:05 +00:00
ce1e84ba51
Remove old ufw job
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
2021-11-26 22:23:41 +00:00
703f2bfa9e
Do avahi-daemon 2021-11-26 21:56:08 +00:00
8c394192b5
Add apt packages 2021-11-26 00:32:28 +00:00
a7483500ff
Fold apt-cache into new structure
Some checks are pending
continuous-integration/laminar-eldarion Build failed with exit code 128 after 1 second
2021-11-25 23:44:56 +00:00
98dce030f8
Import from https://git.starbeamrainbowlabs.com/sbrl/cluster-config/ 2021-11-25 23:26:17 +00:00