|
6a3f5612f4
|
nfs: add cluster-shared-nfs replacement in ensure_nfs
continuous-integration/laminar-eldarion Build failed with exit code 123 after 2 seconds
|
2022-04-28 02:46:24 +01:00 |
|
|
612dbf96b7
|
Add NFS, but it's not *quite* finished yet
continuous-integration/laminar-eldarion Build failed with exit code 123 after 2 seconds
we still need to auto-generate the cluster-shared-nfs script and perhaps
rename it
|
2022-04-27 03:21:13 +01:00 |
|
|
6cf5496c69
|
Add system to tell if we've provisioned before or not
In theory, we can do a one-click "update" with all the same settings as
we used previously
|
2022-04-10 18:06:06 +01:00 |
|
|
cdb959206c
|
wesher: add comments
|
2022-03-21 03:18:43 +00:00 |
|
|
a500bf9a2d
|
fixup
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
|
2022-03-21 03:16:45 +00:00 |
|
|
3080a4a04e
|
wesher: rotate
continuous-integration/laminar-eldarion Build failed with exit code 123 after 5 seconds
|
2022-03-21 03:16:09 +00:00 |
|
|
5d25c496cd
|
wesher: queue firewaall rules
|
2022-03-21 03:13:38 +00:00 |
|
|
736458538b
|
add wesher + wireguard
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
with a huuuuuge hack
|
2022-03-21 03:11:06 +00:00 |
|
|
4a0111d54c
|
apt: also dist-upgrade etc
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
|
2022-03-21 02:43:09 +00:00 |
|
|
dc97aa89a1
|
apat-cache: fix bug
continuous-integration/laminar-eldarion Build failed with exit code 123 after 5 seconds
|
2022-03-21 02:35:48 +00:00 |
|
|
f159700ca8
|
Add hostname configuration
continuous-integration/laminar-eldarion Build failed with exit code 123 after 6 seconds
|
2022-03-21 02:30:49 +00:00 |
|
|
741d6c2c03
|
Finalise initial collectd implementation
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
...it's still all untested.
|
2021-12-26 15:33:35 +00:00 |
|
|
d11506c302
|
Add collectd
continuous-integration/laminar-eldarion Build failed with exit code 123 after 4 seconds
|
2021-12-26 14:48:57 +00:00 |
|
|
f112c82140
|
sbrl-apt-repo: migrate to new system
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:29:34 +00:00 |
|
|
e3103db431
|
laminar ssh: no need for sudo, we're already root
|
2021-11-26 22:25:55 +00:00 |
|
|
5688058732
|
Add logrotate fix
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:24:06 +00:00 |
|
|
b2bff80bc6
|
ufw: fixup
|
2021-11-26 22:20:10 +00:00 |
|
|
1b85d4552c
|
tweak wording
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:19:33 +00:00 |
|
|
1ba923e551
|
Add laminar ssh key
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:15:06 +00:00 |
|
|
90780d2b52
|
chmod +x
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:10:38 +00:00 |
|
|
c557d5f70a
|
ufw: shellcheck strikes again
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:10:01 +00:00 |
|
|
ef211cab3f
|
at-cache: shellcheck
continuous-integration/laminar-eldarion Build failed with exit code 123 after 3 seconds
|
2021-11-26 22:08:07 +00:00 |
|
|
3cfc950335
|
Add lantern stage/task_begin/end directives to make output pretty
continuous-integration/laminar-eldarion Build failed with exit code 123 after 5 seconds
|
2021-11-26 22:05:50 +00:00 |
|
|
bcb8a1c6c3
|
Fiddle with ufw ordering
continuous-integration/laminar-eldarion Build failed with exit code 123 after 2 seconds
|
2021-11-26 21:59:46 +00:00 |
|
|
2989e82ddf
|
Do ufw
continuous-integration/laminar-eldarion Build failed with exit code 123 after 2 seconds
|
2021-11-26 21:56:13 +00:00 |
|
|
703f2bfa9e
|
Do avahi-daemon
|
2021-11-26 21:56:08 +00:00 |
|
|
45ad633d1c
|
Update lantern
continuous-integration/laminar-eldarion Build 5 succeeded in 4 seconds .
|
2021-11-26 21:42:47 +00:00 |
|
|
f281bf73f3
|
run.sh: implement preinstall/install/postinstall logic
continuous-integration/laminar-eldarion Build failed with exit code 128 after 1 second
|
2021-11-26 00:49:32 +00:00 |
|
|
aa96b66372
|
Docker config/preinstall/postinstall steps
|
2021-11-26 00:49:09 +00:00 |
|
|
b624232e27
|
apt update preinstall step
|
2021-11-26 00:48:55 +00:00 |
|
|
5f0cbcd427
|
initial cluster-config postinstall step
|
2021-11-26 00:48:42 +00:00 |
|
|
629109357d
|
apt-cache: move from steps to steps-config
|
2021-11-26 00:33:37 +00:00 |
|
|
5041e5aea4
|
apt-cache: add config step
|
2021-11-26 00:33:21 +00:00 |
|
|
74d5b16c06
|
run.sh: add utility functions & initial setup step
|
2021-11-26 00:32:48 +00:00 |
|
|
8c394192b5
|
Add apt packages
|
2021-11-26 00:32:28 +00:00 |
|
|
d896a5831b
|
Fill out apt cache config file
continuous-integration/laminar-eldarion Build failed with exit code 128 after 1 second
|
2021-11-26 00:06:18 +00:00 |
|
|
a7483500ff
|
Fold apt-cache into new structure
continuous-integration/laminar-eldarion Build failed with exit code 128 after 1 second
|
2021-11-25 23:44:56 +00:00 |
|
|
8f06292c41
|
Create initial top-level run script
continuous-integration/laminar-eldarion Build failed with exit code 128 after 1 second
|
2021-11-25 23:44:31 +00:00 |
|
|
d726e71aef
|
Add lantern build engine
|
2021-11-25 23:29:17 +00:00 |
|