Commit graph

15 commits

Author SHA1 Message Date
fc2e5133f8
[201] Copy feedback svg to output
All checks were successful
continuous-integration/laminar-elessar Build 70 succeeded in 1 minute 14 seconds .
2019-10-21 14:20:31 +01:00
f6bfba4b6a
Add auto-rendering of lab sheet to build script
All checks were successful
continuous-integration/laminar-elessar Build 65 succeeded in 1 minute 18 seconds .
2019-10-21 13:08:54 +01:00
40ae615aa3
Use variable when saying where we're deploying to
All checks were successful
continuous-integration/laminar-elessar Build 32 succeeded in 1 minute 1 second .
2019-03-28 18:39:44 +00:00
0b817e56f9
Add nice header
All checks were successful
continuous-integration/laminar-elessar Build 31 succeeded in 1 minute 8 seconds .
2019-03-28 18:38:22 +00:00
c988a0c73d
Build/Bugfix: Correct paths again
All checks were successful
continuous-integration/laminar-elessar Build 82 succeeded in 48 seconds .
2019-03-12 21:28:59 +00:00
213b38a393
build: correct paths
All checks were successful
continuous-integration/laminar-elessar Build 81 succeeded in 50 seconds .
2019-03-12 21:27:05 +00:00
bbd5be43c5
Remove rogue semicolons
All checks were successful
continuous-integration/laminar-elessar Build 80 succeeded in 54 seconds .
2019-03-12 21:24:55 +00:00
ab6b0d0caa
build: Document ci task better
All checks were successful
continuous-integration/laminar-elessar Build 79 succeeded in 48 seconds .
2019-03-12 21:08:08 +00:00
23cfa8dfe9
Automatically deploy slide deck to starbeamrainbowlabs.com
Some checks are pending
continuous-integration/laminar-elessar Build failed with exit code 55 after 54 seconds
2019-03-12 21:01:16 +00:00
fd7a215c96
Do the setup in dev mode
All checks were successful
continuous-integration/laminar-elessar Build 70 succeeded in 45 seconds .
2019-03-11 16:57:06 +00:00
2a3b126e2a
Do CI in production mode
Some checks are pending
continuous-integration/laminar-elessar Build failed with exit code 55 after 18 seconds
2019-03-11 16:55:29 +00:00
e16abe3e6d
Fix setup task
All checks were successful
continuous-integration/laminar-elessar Build 2 succeeded in 44 seconds .
2019-03-11 16:52:26 +00:00
234ed7e9ed
Add CI task
Some checks are pending
continuous-integration/laminar-elessar Build failed with exit code 55 after 8 seconds
2019-03-11 16:50:10 +00:00
23325d02fc
Finish setting up the pipeline. 2019-03-09 16:46:03 +00:00
353d3f43db
Start setting everything up 2019-03-09 16:07:44 +00:00