bbd5be43c5
|
Remove rogue semicolons
continuous-integration/laminar-elessar Build 80 succeeded in 54 seconds .
|
2019-03-12 21:24:55 +00:00 |
|
|
ab6b0d0caa
|
build: Document ci task better
continuous-integration/laminar-elessar Build 79 succeeded in 48 seconds .
|
2019-03-12 21:08:08 +00:00 |
|
|
23cfa8dfe9
|
Automatically deploy slide deck to starbeamrainbowlabs.com
continuous-integration/laminar-elessar Build failed with exit code 55 after 54 seconds
|
2019-03-12 21:01:16 +00:00 |
|
|
fd7a215c96
|
Do the setup in dev mode
continuous-integration/laminar-elessar Build 70 succeeded in 45 seconds .
|
2019-03-11 16:57:06 +00:00 |
|
|
2a3b126e2a
|
Do CI in production mode
continuous-integration/laminar-elessar Build failed with exit code 55 after 18 seconds
|
2019-03-11 16:55:29 +00:00 |
|
|
e16abe3e6d
|
Fix setup task
continuous-integration/laminar-elessar Build 2 succeeded in 44 seconds .
|
2019-03-11 16:52:26 +00:00 |
|
|
234ed7e9ed
|
Add CI task
continuous-integration/laminar-elessar Build failed with exit code 55 after 8 seconds
|
2019-03-11 16:50:10 +00:00 |
|
|
23325d02fc
|
Finish setting up the pipeline.
|
2019-03-09 16:46:03 +00:00 |
|
|
353d3f43db
|
Start setting everything up
|
2019-03-09 16:07:44 +00:00 |
|